Uwekaji na Uanzishaji wa Turbine
Uwekaji Ulioratibiwa na OEM kutoka Bolt ya Kwanza ya Msingi hadi Mvuke wa Kwanza
10+
Chapa za OEM Zilizoanzishwa
5kW–60MW
Wigo wa Nguvu Unaoshughulikiwa
100%
Nyaraka Kulingana na Vipimo vya OEM
24×7
Msaada wa Eneo la Kazi Unapatikana
Why It Matters
A single clearance set wrong during erection can destroy a bearing within hours of first steam. Our field engineers with prior OEM experience have commissioned the same machine types you're installing, and they know exactly what the OEM specification means in practice, not just on paper.
Overview
Turbine erection and commissioning is the most critical phase of any power plant or industrial project. Errors during erection (incorrect alignment, improper clearances, wrong torques) compound into expensive failures within the first year of operation. Keshav Enterprises brings field engineers with prior OEM experience who have commissioned Triveni, Siemens, BHEL, Belliss & Morcom, and Maxwatt turbines across power plants, sugar mills, paper mills, and process industries. Hold points are witnessed with the client, clearances are recorded, and safety systems are proof-tested before steam is admitted. Our documentation package meets client, insurer, and OEM handover requirements.
Our Process
Ukaguzi wa Uhandisi Kabla ya Uwekaji
Ukaguzi wa kina wa mwongozo wa uwekaji wa OEM, michoro ya GA, P&ID, na michoro ya msingi wa ujenzi. Utambuzi wa nukta zote za kusimama, nukta za kushuhudia, na mahitaji ya nyaraka kabla ya kuinua kifaa cha kwanza. Mfuatano wa uwekaji na njia muhimu hukubaliwa na timu ya mradi ya mteja.
Maandalizi ya Msingi na Sahani ya Chini
Usawazishaji sahihi na grouting ya sahani ya chini ya turbine ndani ya 0.05 mm/m. Ukataji na uwekaji wa chock. Ukazaji wa bolt za msingi kulingana na msokoto uliobainishwa na OEM ukitumia funguo za hydraulic zilizosawazishwa. Maandalizi ya epoxy grout, kumwaga, na ufuatiliaji wa kuponya na urekodi wa joto.
Uwekaji wa Kifaa na Upatanishi Mbaya
Uwekaji sahihi wa nafasi ya casing ya turbine, gearbox, na kifaa kinachoendeshwa kwenye sahani ya chini. Upatanishi mbaya wa mhimili ukitumia dial gauge na vifaa vya leza ndani ya 0.1 mm kabla ya uwekaji wa coupling. Ukaguzi na urekebishaji wa soft foot kwenye miguu yote ya mtambo kabla ya upatanishi wa mwisho.
Uunganishaji wa Ndani na Uwekaji wa Nafasi za Kiufundi
Upimaji wa kushuka kwa rota, uwekaji wa nafasi ya gland (radial na axial), uwekaji wa seal ya labyrinth, uwekaji wa thrust bearing, na uwekaji wa nafasi ya journal bearing. Nafasi zote za kiufundi zinarekodiwa kulingana na vipimo vya OEM katika daftari la nafasi za kiufundi za eneo la kazi. Kupima na kuthibitisha rotor end float ndani ya mipaka ya OEM.
Miunganisho ya Mabomba na Mifumo Msaidizi
Miunganisho ya mabomba ya kuingiza mvuke, utoaji, uchimbaji, na mifereji kwa msaada sahihi wa bomba na spring hanger. Mizigo ya nozzle inathibitishwa ndani ya mipaka ya OEM — mkazo wa bomba unaondolewa kabla ya muunganisho wa mwisho. Mabomba ya mafuta ya kulainisha, mafuta ya udhibiti, mvuke wa gland, na vipimo yanakamilika na kujaribiwa kwa uvujaji.
Ukaguzi Kabla ya Uanzishaji na Usafishaji
Mfumo wa mafuta ya kulainisha unasafishwa hadi kiwango cha usafi cha ISO 4406, kikithibitishwa na hesabu ya chembe. Ukaguzi wa utendaji wa mifumo ya udhibiti na kusimama. Majaribio ya mifumo ya usalama yanafanywa na kurekodiwa: kusimama kwa mwendo kupita kiasi, kusimama kwa shinikizo dogo la mafuta, kusimama kwa joto la juu la bearing, uendeshaji wa valvu ya kusimamisha dharura.
Kuwasha Mara ya Kwanza, Kuongeza Kasi na Uanzishaji
Kuanza kwa kwanza kudhibitiwa na jaribio la kusikia kwa mzunguko wa polepole. Kuongeza kasi katika hatua zilizobainishwa na ufuatiliaji endelevu wa mtetemo na joto la bearing. Majaribio ya mwitikio wa governor na dead-band. Jaribio la kusimama kwa mwendo kupita kiasi kwa 110% ya kasi ya kiwango. Jaribio la kukubali mzigo na makabidhiano ya uendeshaji wa mzigo kamili na ripoti ya uanzishaji.
Gallery
What's Included
- Turbine za mvuke, pampu, compressors, feni, condensers
- Korongo za EOT, muundo wa chuma na kazi ya mabomba
- Usimamizi wa ujenzi kulingana na vipimo vya OEM na viwango vinavyotumika
- Uratibu na OEM katika hatua zote
- Nyaraka kamili kwa ajili ya makabidhiano kwa uendeshaji
- Utengenezaji na utekelezaji wa taratibu za kabla ya uanzishaji
- Msaada wa kuanzisha na kurekebisha kulingana na mahitaji ya uendeshaji
OEM Expertise
Machine already faulty or tripping? Our engineers diagnose root cause before anything is dismantled.
Huduma ya Utatuzi wa Matatizo →Related Case Studies
Ready to discuss uwekaji na uanzishaji wa turbine?
Tell us your turbine make and requirement — we respond with a technical scope.